Skip to content

Introduction to Business and Management

University Business · Topic 1

1.1

What this course is, and how to use it

This is the first course in University Business: an evidence-based introduction to business and management 基于证据的商务与管理导论. It builds the vocabulary every later course assumes — accounting, economics, marketing, operations — while training one habit above all: separating facts 事实 from assumptions 假设, and both from conclusions 结论.

  • Units 1.1 to 1.3 map the territory: organisations, stakeholders, ownership and the external environment.
  • Units 1.4 to 1.6 look inside: decisions, business models and entrepreneurship.
  • Unit 1.7 assembles the course's central skill — the evidence-based case analysis.

The running case in this handout is Nimbus Bakery 雨云烘焙, a fictional two-shop bakery: small enough to reason about completely, real enough that every framework earns its place. Numbers in worked examples are illustrative and say so. Each unit opens with a story, shows a picture before the formal idea, defines terms precisely, works two escalating examples whose arithmetic is machine-verified, names the mistakes people actually make, and closes with a three-line summary.

Vocabulary Train
English
evidence-based introduction to business and management/ˈevɪdəns beɪst ˌɪntrəˈdʌkʃn tə ˈbɪznəs ænd ˈmænɪdʒmənt/
facts/fækts/
assumptions/əˈsʌmpʃnz/
conclusions/kənˈkluːʒnz/
management/ˈmænɪdʒmənt/
nimbus bakery/ˈnɪmbəs ˈbeɪkəri/
1.1

Organisations and stakeholders

Two friends bake brilliant bread and must decide: sell at a weekend market, contract independently with cafés, or open one shop together. The last option creates an organisation 组织 — and this unit explains when that is the cheap choice, and who then holds power over it.

An organisation is a group of people pursuing a purpose that outlasts any one member — firms, charities, public agencies. Why they exist at all: when transactions inside one firm are cheaper than contracting every task separately in the market (hiring a baker once beats negotiating every loaf), coordination through an organisation wins. The boundaries move — the same bakery might outsource delivery — wherever the comparison flips.

Stakeholders 利益相关者 are the people and groups who affect, or are affected by, the organisation. Map them honestly — influence and interest differ:

Stakeholder Main interest Power over Nimbus
Owner-founder profit, reputation, growth decides
Customers quality, price, convenience choose competitors
Staff fair pay, stable hours can leave
Landlord, suppliers paid on time can withhold
Nimbus Bakery's stakeholders on an interest-power grid: owner-founder and customers in the manage-closely corner, staff high interest but lower power, landlord and suppliers high power but low interest
Where each stakeholder sits decides how you manage them

Worked example 1 (read the map). Nimbus plans Sunday opening. Reading the grid: customers (high interest, moderate power — they can simply not come) need a reason — a promoted Sunday item; staff (high interest, low power) need notice and pay, and their interest can become power if two of four resign; the landlord (high power, low interest) needs nothing — Sunday opening is inside the lease. The map ranks the conversations: customers first, staff second, landlord not at all.

Worked example 2 (map the resistance, escalated). The same bakery considers a supplier switch to a cheaper flour mill. New stakeholder positions: the incumbent supplier (high interest — this is their revenue; low-to-moderate power — a contract with 60 days' notice); the new mill (low current interest, rising if it wins the tender); the owner's bank (low interest unless margins move the loan covenant). The map's decision content: the veto-free path exists, and the real risk is quality regression — a customer stakeholder effect, not a supplier one. A stakeholder map that only lists friends and enemies has missed its job: predicting where the surprise comes from.

Common mistakes. Treating every stakeholder as equally important — the whole point is ranking. Forgetting regulators and lenders until they object. Listing internal departments as external stakeholders.

Summary: organisations exist when internal coordination beats market contracting; stakeholders map on interest and power; the map ranks whose expectations to manage first and predicts where resistance will actually come from.

Vocabulary Train
English
organisation/ˌɔːɡənaɪˈzeɪʃn/
stakeholders/ˈsteɪkhəʊldəz/
1.2

Ownership and governance

The friends open the shop together — and immediately face the question that shapes every firm's future: whose money is at risk, who decides, and who can sell out? The three main ownership forms 企业形式 differ on exactly those three axes — liability, finance and control:

Form Liability Finance Control
Sole trader 个人独资 unlimited, personal assets at risk owner's savings, loans one person
Partnership 合伙 joint and several (usually) partners' capital partners agree
Company 公司 limited to what is invested shares can be sold shareholders elect directors
Sole trader, partnership and company compared on who decides, what owners can lose, where money comes from and how much paperwork each needs

Limited liability 有限责任 — shareholders can lose only what they invested — is the invention that made large-scale risk capital possible: strangers will fund a ship voyage if the worst case is their ticket, not their house. Its cost: governance 治理, the system of boards, voting and disclosure that runs the company on the owners' behalf. Agency problems 代理问题 arise because managers (the agents) have their own interests — salaries, safety, status — and governance exists to keep them answerable to the shareholders whose money they spend.

Worked example 1 (the form follows the risk). Three bakery ownership options, priced: sole trader — the founder's flat is exposed if the business fails; partnership — each partner can bind the others (joint and several liability), fine while everyone bakes, lethal when one signs a flour contract alone; company — the founder pays incorporation and accounting costs but caps the loss at the investment. For a two-shop bakery with one lease and four staff, the company's protection usually earns its cost — but that is a judgement about their risk tolerance, and the analysis says so.

Worked example 2 (the arithmetic of each form, escalated). Year-end profit is £86,500. Partnership sharing 3:2 (agreed in writing): £51,900 and £34,600 — tax arrives on each partner's share whether or not it was drawn. As a company: the same £86,500, of which 25% (£21,625) is retained; the board declares the remaining £64,875 as dividend on 60,000 £1 shares — £1.08 per share. Same profit, different cash timing, different tax treatment, different control (the 3:2 partners each have a vote; the 60/40 shareholders elect the board). Ownership form is not paperwork — it reallocates money and power, and the numbers show how.

Common mistakes. Confusing limited liability with no responsibility — directors can still be personally liable for wrongful trading. Assuming the 50/50 partnership is safe: equal votes plus no tie-break clause equals deadlock. Reading "the shareholders own the company" as "the shareholders run the company".

Summary: liability, finance and control are the three axes; limited liability bought scale at the price of governance; profit splits and dividends are where the form shows up in arithmetic; agency problems are why governance exists.

Vocabulary Train
English
ownership forms/ˈəʊnəʃɪp fɔːmz/
limited liability/ˈlɪmɪtɪd ˌlaɪəˈbɪlɪti/
governance/ˈɡʌvənəns/
agency problems/ˈeɪdʒənsi ˈprɒbləmz/
sole trader/səʊl ˈtreɪdə/
partnership/ˈpɑːtnəʃɪp/
company/ˈkʌmpəni/
1.3

The external environment

No firm chooses its weather. Bread demand can fall in a recession, a new low-carb trend can cut breakfast sales, a sugar tax can change the price list — none of it decided by the bakery. The external environment 外部环境 splits into the close-in (competitors, suppliers, customers, regulation) and the wide (economic cycles, technology, social change, law). Frameworks like PESTEL are checklists, not theories: their value is preventing you from forgetting a factor, not predicting it.

The external environment as two rings round Nimbus: close-in players it can partly influence (customers, rivals, suppliers, landlord) and six PESTEL forces it can only adapt to

The discipline is evidence: claims about the environment need dates, sources and definitions. "Bread demand is falling" is a hypothesis until it carries a number, a period and a geography — and even then, ask what would have to be true for the trend to reverse. And ask of every driver: can the firm influence it, or only adapt to it? A bakery cannot move the business cycle; it can move its supplier list.

Worked example 1 (grade the claims). Three claims from a trade article: "Bakery closures up 12% (source: trade association, 2025, UK)" — a fact, but check the denominator and the definition of closure; "Consumers want more artisan products" — an assumption dressed as fact: which consumers, measured how?; "Rent inflation will continue" — a forecast, i.e. an assumption with a confidence interval nobody wrote down. Sorting those three is the unit's entire skill: facts carry sources, assumptions carry owners.

Worked example 2 (driver → decision, escalated). Take the two clean facts — closures up 12%, and (invented for the case) supermarket in-store bakery prices down 4% — and walk them to a decision. If closures release skilled bakers, Nimbus' staffing risk falls (a hiring opportunity); if supermarket prices fall, Nimbus cannot win a price war and must win on freshness and pre-order convenience — a positioning conclusion. Each link in that chain is marked: closures → labour supply (fact → assumption about mobility); prices → positioning (fact → strategic assumption). The environment unit ends not with a list of forces but with options the forces have priced.

Common mistakes. Treating PESTEL as an analysis rather than a checklist. Quoting a percentage without its period, geography and source. Confusing "influence" with "predict" — the point is to prepare responses, not to foretell.

Summary: close-in versus wide environment; frameworks prevent forgetting, they do not explain; every environmental claim needs a number, a period, a geography and a source; walk each driver to a decision and mark the factual and assumptional links.

Vocabulary Train
English
external environment/ekˈstɜːnl enˈvaɪrənmənt/
1.4

Managers, management and decisions

The bakery's founder faces the course's favourite dilemma: open a third shop, or expand pre-order? Both sound strategic; both have advocates; the choice will be made on Tuesday. Management 管理 is exactly this — deciding what to do and making it happen: planning, organising, leading and controlling — a loop, not a hierarchy. The course trains one piece deliberately: structured decisions 结构化决策.

  1. Frame the question precisely (a decision to make, not a topic to discuss).
  2. List options that could actually be chosen.
  3. Name the criteria and their weights before seeing the options' scores.
  4. Score the evidence, mark each score as fact or assumption.
  5. Choose, then record what the decision assumes — so reality can prove you wrong.
The five-step decision loop from framing to recorded assumptions, with the Nimbus third-shop-versus-pre-order question at the centre
Weights fixed before scores, every score marked fact or assumption

Bias 偏见 is the standing enemy: anchoring on the first number, confirming what you already believe, weighting the most recent event too highly. The structure above exists to slow those down, not because managers enjoy paperwork.

Worked example 1 (the decision table, verified). Nimbus weighs a third shop against a pre-order expansion. Criteria and weights fixed first: profit impact (0.5), risk (0.3), fit with staff skills (0.2). Third shop scores 6, 4, 7 → $0.5\times 6 + 0.3\times 4 + 0.2\times 7 = 5.6$. Pre-order scores 5, 7, 8 → $0.5\times 5 + 0.3\times 7 + 0.2\times 8 = 6.2$. Pre-order wins — not because it is exciting, but because the weights said risk and fit matter.

Worked example 2 (the sensitivity that makes the table honest, escalated). The founder's sister disputes the profit weight: "It's a business — weight profit 0.6." Recompute with weights 0.6 / 0.25 / 0.15: third shop $0.6\times6 + 0.25\times4 + 0.15\times7 = 5.65$; pre-order $0.6\times5 + 0.25\times7 + 0.15\times8 = 5.95$ — pre-order still wins. Solve for the flip point: with fit fixed at 0.2, the weighted totals cross at profit weight 0.65 (both 5.9). So the recommendation is robust to any profit weight below 0.65 and fragile above it — one number that tells the family exactly how far their disagreement has to go before the answer changes. That is what a decision table is for: making the disagreement discussable.

Stacked bars of weight times score for each criterion: the third shop totals 5.6 and pre-order totals 6.2
The weights, not the excitement, decide the winner

Common mistakes. Choosing weights after seeing scores — the table then only decorates the verdict. Scoring on adjectives ("strong") instead of anchored scales ("6 = payback under 3 years"). Forgetting step 5: a decision without recorded assumptions cannot be audited when it fails.

Summary: management is a loop of planning, organising, leading and controlling; structure the big decisions — frame, options, weights first, scored evidence, recorded assumptions; sensitivity analysis converts disagreement into one number.

Vocabulary Train
English
structured decisions/ˈstrʌktʃəd dɪˈsɪʒnz/
bias/ˈbaɪəs/
1.5

Business models and value creation

A second shop in a richer district, a market stall on Saturdays, a pre-order subscription — each is a different business model 商业模式: a description of how the organisation creates, delivers and captures value 价值. The classic lens is the value chain 价值链 — the sequence of activities from inbound ingredients to a served customer:

inbound logistics → operations → outbound logistics → marketing and sales → service

Five value-chain chevrons from inbound logistics to service, each labelled with what Nimbus does there: daily deliveries, fresh baking, two shops and pre-order pickup, premium prices, cross-trained staff
Nimbus' value chain, link by link

Nimbus' model: fresh-daily baking (operations) sold at premium prices through two shops and pre-order (marketing and channels), with staff cross-trained (service). Every link must fit: pre-order only pays if operations can batch it cheaply.

The test of a model is arithmetic, not adjectives: revenue per customer × customers must cover variable costs, fixed costs and the owner's minimum return — otherwise the model is a hobby.

Worked example 1 (the model as arithmetic, verified). Nimbus' numbers: average basket £9.40; about 3,500 customers per shop per week across both shops — call it 4,200 baskets weekly for two shops open six days. Weekly revenue $4{,}200 \times 9.40 = £39{,}480$. Ingredients and packaging run 42% of sales (variable), so contribution is $39{,}480 \times 0.58 = £22{,}898$. Fixed costs weekly — rent £6,200 (two leases), staff £2,600, energy and other £800 — total £9,600. Weekly profit $22{,}898 - 9{,}600 = £13{,}298$. Break-even: daily fixed $9{,}600/6 = £1{,}600$; contribution per basket $9.40 \times 0.58 = £5.45$; each shop needs $1{,}600 / 5.45 \approx 294$ baskets a day. The model is a model only because that arithmetic closes — and every one of those figures is marked assumption until the accounts say otherwise.

Worked example 2 (profit is not cash, escalated). A quieter month: sales made £34,000, of which £4,000 is a corporate customer still on invoice; expenses incurred £28,500, of which £600 is a supplier not yet paid. Profit (matching incurred against earned) is $34{,}000 - 28{,}500 = £5{,}500$. Cash movement is $(34{,}000 - 4{,}000) - (28{,}500 - 600) = £2{,}100$. Both numbers are true, both are needed, and the £3,400 gap is exactly the receivable the corporate customer is holding. A profitable firm without cash fails just as dead: the value chain feeds the profit line, but the calendar of payments decides survival.

Common mistakes. Describing the model in adjectives with no unit economics. Confusing revenue (sales made) with profit (revenue minus expenses incurred) with cash (money in the bank). Testing a model's links separately — the chain only pays when the links fit together.

Summary: a business model is create-deliver-capture, mapped link by link on the value chain; the test is arithmetic — baskets × contribution vs fixed costs; revenue, profit and cash are three different things and all three must survive.

Vocabulary Train
English
business model/ˈbɪznəs ˈmɒdl/
value/ˈvæljuː/
value chain/ˈvæljuː tʃeɪn/
1.6

Entrepreneurship

Nimbus' founder is offered a market stall in a neighbouring town: six weekends, a few hundred pounds of fees, and no idea whether anyone there wants £9 hampers of sourdough. Entrepreneurship 创业 is pursuing an opportunity under uncertainty with resources you do not fully control — and this unit is the discipline that keeps the pursuit honest.

  • Evaluate the opportunity 机会 before the passion: who exactly has the problem, how do they solve it today, and why would they switch?
  • Size the resources honestly: what must be true for this to work, and which of those things is an assumption rather than a fact?
  • Plan to learn: small tests first (a market stall before a second shop), milestones with dates, and an honest statement of what failure would look like.

Risk 风险 is measurable (probabilities known); uncertainty 不确定性 is not. Entrepreneurship lives in the second, which is why milestone planning beats five-year forecasting.

A milestone ladder: count footfall for £200, run a market stall for £1,200, and sign a £45,000 lease only if the stall clears its target, each target and stop rule written before the test

Worked example 1 (the stall test, priced honestly). Six weekends at the neighbouring market: stall fees £350 per weekend; flour, packaging and transport run 45% of sales. If takings are £3,800 across the six weekends, the result is $3{,}800 \times 0.55 - 350 \times 6 = 2{,}090 - 2{,}100 = -£10$ — break-even to the pound. The test was worth running precisely because the answer was marginal: it bought real demand data (which items sold, at what hours, to whom) for £10, a price no consultant would quote. Marked honestly: the £3,800 is a fact after the sixth weekend, an assumption before the first.

Worked example 2 (milestones and runway, escalated). The founder has £26,000 of savings allocated to the second shop and estimates burn (rent deposit fit-out, pre-opening wages) of £2,200 per week: runway $26{,}000/2{,}200 \approx 11.8$ weeks. The milestone plan that follows: signed lease by week 3 (or walk away with £19,400 intact); fit-out passed by week 7; opening stock and staff trained by week 10; open by week 11 with £2,000 contingency. Each milestone is a real-option: miss week 3 and the honest decision is to stop, not to compress every later stage into the remaining money. Entrepreneurship's arithmetic is the arithmetic of stopping rules.

Common mistakes. Falling in love with the solution before pricing the problem. Treating the business plan as a prediction rather than a list of testable assumptions. Spending to the last pound of runway because stopping feels like failure — running out mid-build is the actual failure.

Summary: opportunities are evaluated, not felt; small tests buy information at known prices; milestones with dates turn a runway into a sequence of stopping rules; risk is measurable, uncertainty is not, and entrepreneurship lives in the second.

Vocabulary Train
English
entrepreneurship/ˌɒntrɪprəˈnjʊəʃɪp/
opportunity/ɒpəˈtjuːnɪti/
risk/rɪsk/
uncertainty/ʌnˈsɜːtənti/
1.7

Evidence-based case analysis

The course's final skill assembles all of the above into a case analysis 案例分析:

  1. Situation: what are the facts, with sources? What is merely assumed?
  2. Problem: the decision to be made, stated as a question with options.
  3. Analysis: apply the frameworks that earn their place — stakeholder map, value chain, decision table — each carrying evidence, not adjectives.
  4. Recommendation: one option, chosen against stated criteria, with its risks named and its assumptions listed for monitoring.
  5. Review: the metrics that would tell you the recommendation is failing.

Worked example 1 (the case in five lines). Nimbus' Sunday-opening case in the full frame: Situation — two shops, four staff, weekend competitors opening (sourced trade listing); Problem — "Should Nimbus open Sundays?" with options {open both shops, open one, not open}; Analysis — the decision table (worked example in 1.4) plus staffing interest from 1.1; Recommendation — open one shop, six-week trial; Review — Sunday baskets/day vs the 294 break-even, staff turnover, cannibalisation of Saturday. Every framework that appeared earned its place; none arrived as decoration.

Worked example 2 (assumption audit, escalated). Take the recommendation above and list what it assumes, each with a monitoring metric: customers will travel on Sundays (metric: first-four-Sunday baskets vs forecast); the trial will not shift Saturday demand (metric: Saturday baskets year-on-year); staff will accept the rota (metric: rota refusals). Three assumptions, three numbers, three dates. When a classmate says "the analysis was wrong", the audit answers which part — and that answer, not the original verdict, is what improves the next decision.

Common mistakes. Summarising the case instead of deciding in it. Recommending "more research" — name the assumption the research would test. Writing a review section with no numbers or dates; unfalsifiable metrics protect nobody.

Summary: situation-problem-analysis-recommendation-review; frameworks carry evidence or stay home; recommendations travel with named assumptions and dated, falsifiable review metrics — and every claim you meet, in a case, a report or a meeting, gets sorted into fact, assumption or conclusion.

Vocabulary Train
English
case analysis/keɪs əˈnæləsɪs/

Interactive lessons on this topic

Work through it step by step, with instant-check exercises.

More topics in University Business

Log in or create account

IGCSE, A-Level & AP