| English | 释义 | 拼音 |
|---|---|---|
| budget/ˈbʌdʒɪt/ | 预算 | yù suàn |
| income/ˈɪŋkʌm/ | 收入 | shōu rù |
| expenditure/ekˈspendɪtʃə/ | 支出 | zhī chū |
| incremental budgeting | 增量预算 | zēng liàng yù suàn |
| zero-based budgeting | 零基预算 | líng jī yù suàn |
| flexible budget | 弹性预算 | tán xìng yù suàn |
| variance analysis/ˈveərɪəns əˈnæləsɪs/ | 差异分析 | chā yì fēn xī |
| variance/ˈveərɪəns/ | 差异 | chā yì |
| favourable/ˈfeɪvərəbl/ | 有利 | yǒu lì |
| adverse/ædˈvɜːs/ | 不利 | bù lì |
The month the profit went missing
- A hotel restaurant planned to make 12,000 dollars of profit in March. It made 8,500. The manager needs to know where the 3,500 went: fewer diners? Food waste? A higher energy bill?
- A budget 预算 sets the plan in numbers before the month starts. Comparing it with what really happened shows which part of the business needs action.
What a budget is and why firms use it
- A budget is a financial plan for a future period: expected income 收入 and expenditure 支出, and so profit. Firms set sales budgets, cost budgets for each department and an overall profit budget.
- Budgets help with:
- planning: managers must think ahead about sales and costs;
- control: actual results are checked against the plan each month;
- co-ordination: departments work to the same targets;
- motivation: staff who help set a realistic budget have a clear target to aim for.
预算控制周期
Follow how a budget becomes a control system, not just a number.
A budget is:
难度 1/5 · 今日首次完成可获 100 金币及少量额外奖励
A budget plans expected income, spending or profit.
Which are benefits of budgeting? (Select all that apply.)
难度 2/5 · 今日首次完成可获 140 金币及少量额外奖励
Budgets aid planning, control and motivation, but cannot guarantee profit.
How is the budget set?
| Method | How | Good | Weak |
|---|---|---|---|
| Incremental 增量预算 | last year's budget plus or minus a small % | quick and simple | keeps old waste; managers spend it all to keep it |
| Zero-based 零基预算 | start from zero; every cost must be justified | removes waste | slow and costly to prepare |
| Flexible 弹性预算 | costs are adjusted to the actual level of output | fair comparison when sales change | more work to calculate |
A new manager thinks every department spends money it does not need, because each year's budget is last year's plus 3%. Which method should she use?
难度 1/5 · 今日首次完成可获 100 金币及少量额外奖励
Zero-based budgeting starts from nothing, so every cost must be justified. That removes the waste that incremental budgets carry forward.
Variance analysis 差异分析
-
A variance 差异 = actual − budget for each line.
-
Favourable 有利 (F): better for profit: revenue above budget, or a cost below budget. Adverse 不利 (A): worse for profit: revenue below budget, or a cost above budget.
-
The restaurant in March, in thousands of dollars (12.4 = 12,400). Var. = variance.
| $000 | Budget | Actual | Var. |
|---|---|---|---|
| Revenue | 40 | 37 | 3 A |
| Food | 12 | 12.4 | 0.4 A |
| Wages | 14 | 13.5 | 0.5 F |
| Energy | 2 | 2.6 | 0.6 A |
| Profit | 12 | 8.5 | 3.5 A |
-
Check: −3,000 − 400 + 500 − 600 = −3,500, the same as the profit variance.
-
Read revenue and costs the opposite way: lower revenue is adverse, but lower wages are favourable.
Budgeted cost is 4,000 and actual cost is 4,300. What is the size of the variance?
难度 2/5 · 今日首次完成可获 140 金币及少量额外奖励
Variance = |4300 − 4000| = 300 (adverse, as cost rose).
Actual sales above the budgeted figure is a variance that is:
难度 1/5 · 今日首次完成可获 100 金币及少量额外奖励
Higher-than-budgeted revenue is a favourable variance.
A variance where the actual result is worse than budgeted is called ______.
难度 1/5 · 今日首次完成可获 100 金币及少量额外奖励
Adverse = worse than budget; favourable = better.
Budgeted wages were 20,000 and actual wages were 18,500. What is the variance?
难度 1/5 · 今日首次完成可获 100 金币及少量额外奖励
The cost was 1,500 below budget, which is better for profit: favourable.
Flexing the budget: a fairer test
- Revenue was 7.5% below budget (37,000 ÷ 40,000 = 0.925), so fewer meals were served. Fewer meals should need less food, not more.
- A flexible budget adjusts the variable costs to the actual level of sales.
- Flexed food budget = 12,000 × 0.925 = 11,100.
- Actual food cost = 12,400.
- Food variance against the flexed budget = 12,400 − 11,100 = 1,300 adverse.
The simple table showed only 400 adverse. The flexed figure shows a much bigger food problem: waste, theft or higher supplier prices.
A factory budgeted 1,000 units with materials of 8,000. It made 1,200 units and materials cost 9,000. What is the materials variance against the flexed budget? (Enter a positive number; it is favourable.)
难度 2/5 · 今日首次完成可获 140 金币及少量额外奖励
Flexed budget = 8,000 × 1,200 ÷ 1,000 = 9,600. Actual 9,000 is 600 below it: 600 favourable. The simple budget would have shown 1,000 adverse.
Why variances happen, and what to do
| Variance | Possible cause | Possible action |
|---|---|---|
| Revenue adverse | fewer customers, a new rival, prices cut | promotion, review menu prices |
| Food adverse | waste, price rises, poor stock control | smaller orders, new supplier, portion checks |
| Wages favourable | fewer staff on shift | check service quality did not fall |
| Energy adverse | higher tariff, a cold month | new contract, more efficient equipment |
- Find the cause before acting. An adverse variance caused by a supplier's price rise needs a different response from one caused by waste.
Sales revenue is above budget, but there are many customer complaints about slow service, and wages are below budget. What is the best first step?
难度 1/5 · 今日首次完成可获 100 金币及少量额外奖励
A favourable wage variance may come from too few staff, which hurts service and future sales. Find the cause first.
How useful are budgets?
- Strengths: they turn objectives into targets, show early where things go wrong, and make managers accountable for their part of the business.
- Weaknesses: they are based on forecasts that may be wrong. A rigid budget can stop a manager from reacting to a good opportunity. If set too high, they demotivate. If set too low, they are easily beaten and waste resources.
Worked exam answer
Analyse two possible causes of the restaurant's adverse profit variance in March. [6]
Cause 1: fewer customers. Revenue was 3,000 adverse, which is most of the 3,500 profit variance. Fewer diners, perhaps because a new restaurant opened nearby, means less contribution towards fixed costs such as the chef's wages, so profit falls.
Cause 2: food waste or higher food prices. Fewer meals were served, yet food cost 400 more than planned. Against a flexed budget the variance is 1,300 adverse. If the kitchen ordered food for 40,000 of sales but sold only 37,000, unsold fresh food was thrown away, which raises costs and lowers profit.
- Why it scores: each cause is linked to a figure from the table and explained step by step to its effect on profit. The flexed budget shows deeper analysis than "costs went up".
A favourable variance is not always good news. Wages 500 below budget might mean too few waiters, slow service and unhappy customers, which may be part of the reason revenue fell. Always ask why a variance happened.
You've got it
- a budget is a financial plan for income, spending and profit; it helps planning, control, co-ordination and motivation
- incremental, zero-based and flexible budgets are set in different ways
- variance = actual − budget: favourable if better for profit, adverse if worse
- flex the budget when output changes; then find the cause of each variance before acting
Write from the data: find the adverse variance
- Budgeted cost is 5000. Actual cost is 5600.
- Find the variance and say whether it is adverse.
Budgeted cost is 5000 and actual cost is 5600. What is the size of the variance, and is it adverse or favourable?
Actual cost is 600 above budget, so the variance is adverse.
What is the cost variance?
难度 1/5 · 今日首次完成可获 100 金币及少量额外奖励
Spending more than the budget is an adverse cost variance.