Skip to content

Measurement loading, amplifier gain and detector response

Introduced
Video lesson for this topic Open the video page
6:08

Measurement loading, amplifier gain and detector response

In 1928 Hans Geiger and his student Walther Müller, in Kiel, built a gas-filled tube that produced a large electrical pulse for each ionising particle passing…

English narration · English and 中文 subtitles you can switch

In this lesson

Video lesson
Vocabulary
English Meaning
loading/ˈləʊdɪŋ/The change a measuring instrument makes to the circuit it measures.
dead time/ded taɪm/The time after each count during which a detector cannot record another.
cutoff frequency/ˈkʌtɒf ˈfriːkwənsi/The frequency at which a filter passes 1 over root 2 of the input amplitude.
Next →

Handout

Log in or create account

IGCSE, A-Level & AP