Skip to content

IGCSE Physics · November 2020 · Paper 11 · Difficulty 1 · Warm-up

Question 16

16

When a bridge is built, a gap is left between each concrete slab.

Why are these gaps left?

A

Concrete expands on warm days.

B

Concrete contracts on warm days.

C

The gaps expand on warm days.

D

The gaps contract on cold days.

Choose an option to check your answer.

Show the answer

Answer: A

  • On warm days, the concrete slabs expand.
  • Without gaps, the slabs would push against each other and crack or bend.
  • The gaps give the slabs room to expand.
Original question

Log in or create account

IGCSE, A-Level & AP